Projects completed or under way in 2016 included:
- Building of 8,500 m² of Reinforced Earth® for the
LGV SEA high speed line in
France;
- 7, 100 m² of TerraClass® facings on the E75 B2 viaduct
in France;
- 9, 000 m² of TerraClass® facings for the Muak Lek reservoir
in Thailand;
- Reinforced Earth® walls with TerraClass® panels in the
Liquobong mine in Lesotho
Reinforced Earth® walls, high speed line LGV SEA
Photo credit Terre Armée/F. Vigouroux