At the heart of Hopewell Development's new community, Mahogany Lake is
the largest community lake in Calgary. In order to create the 63 acre oasis,
the developer recognized a need to build retaining walls in areas not only
to allow traffic access to the two exclusive islands, but also to maximize
the lake area while also allowing development close to the water’s edge.
Reinforced Earth was chosen to design and supply the nearly 3 km
of submerged walls supporting sidewalks, road traffic and backyards.
Several
key features include 2 bridge walls that include smaller planting walls
allowing the growth of vegetation. Also included are two walls that
contain stairways allowing pedestrian traffic from the top down to the
water’s edge. The construction of the North bridge wall started
in the spring of 2013 with final construction of the South bridge and connecting
lake wall in the spring of 2014.
The unique geometry presented challenges for both the designers and installers
but in the end resulted in the desired architectural effect. Geometric
and architectural enhancements to Reinforced Earth Walls often only add
very slightly to the project cost but result in a significant increase
in the overall aesthetics of the project.
The
Reinforced Earth wall is a gravity wall that consists of three (3) major
components: precast concrete facing, galvanized steel soil reinforcements
and granular backfill. It is proportioned and designed internally to resist
the applied loads in accordance with well-established standards. The inherent
compressive and shear strength properties of the soil are improved by the
tensile strength of the soil reinforcements in these structures. A positive
connection design of the reinforcement with the facing of the Reinforced
Earth wall is required to prevent overstressing at the connection and to
minimize post-construction movement. This wall is designed based on the
Canadian Highway Bridge Design Code (CHBDC) CSA S6-06 and City of Calgary
Design Guidelines. The walls are designed for a service life for 75 years.
In
the Mahogany development project, the 1.5 meter by 1.5 meter square shape
precast panel was chosen for architectural reasons. The square panels are
aligned with less than 9m radius curves in some sections. The unique shape
of the panel joints, similar to the cruciform panels, enables the square
panels to make that curve without excessively opening up the joint in convex
curves and closing the joints in the concave curves. Panels have 20mm joints
all around the panel to create more flexibility. The joints accommodate
relatively large differential settlement which is limited to 1%. In most
of the sections, the Reinforced Earth wall is partially submerged (up to
2m); therefore the backfill was specified with low amount of fine content
so that the water from artificial pond can flow in and out of the reinforced
zone without imposing any hydrostatic pressure. Since the construction
season is short in Calgary, a backfill was utilized in this project which
is less sensitive for placement in the winter. For this reason, the contractor
was able to place and compact the backfill in sub-zero temperatures that
increased the productivity and helped the construction schedule. Another
unique feature in the project is the Reinforced Earth staircase. The 2.20
meter wide staircase with about 35 stairs was designed and built with Reinforced
Earth system and provided a pleasant look to the structure.
As
originators of MSE Technology, Reinforced Earth continues to lead the industry
in reliability that comes from their years of experience. Clients
have grown to trust the name and the products associated with Reinforced
Earth and increasingly recognize the difference between RECo and their
competitors when it comes to avoiding both construction and post construction
problems.